
Downtown Pontiac revitalization project reaches new milestones
Published by CBS Detroit

Published by CBS Detroit
Published by The Oakland Press

Published by Channel 7 ABC | WXYZ Detroit

Published by The Detroit News

Photo gallery by The Detroit News

A new facade panel was installed at 31 E. Judson as building renovations move forward toward 2027 occupancy.


Published by Channel 7 ABC | WXYZ Detroit
Two-track program develops Pontiac-based professionals and introduces local students to architecture, engineering, and construction careers.

Published by Channel 7 ABC | WXYZ Detroit
Showing 1–10 of 38 items